INSTALLATION MANUAL
Flexible Molding Installation Instructions
Dry-fit, adhere, fasten, join, and finish flexible molding while maintaining the intended profile and curve.
INSTALLATION MANUAL
Dry-fit, adhere, fasten, join, and finish flexible molding while maintaining the intended profile and curve.
Illustrated flexible-molding installation sequence
Align the bedding edges and visible profile before securing either side of the transition. Follow the product instructions for the required joint gap; a small gap is often needed for joint adhesive and finishing. Support both pieces so they cannot shift while the joint cures.
Where two flexible pieces meet, match the profile carefully, apply approved joint adhesive, and allow the complete cure time before filling or sanding. Do not force a misaligned joint closed with fasteners.